NYC facade inspections: FISP and Local Law 11.

Updated 3 min readBy ASH Group NYC

If your building is taller than six stories, the city requires a facade inspection every five years. Here’s what the inspection involves, what the report classifications mean, and the deadlines that start once a problem is found.

What it is

What FISP requires.

The Facade Inspection & Safety Program (FISP), also called Local Law 11, applies to owners of buildings higher than six stories. Exterior walls and attachments such as balconies, railings and parapets must be inspected and a technical report filed with the Department of Buildings (DOB) every five years.

Your filing window is set by a sub-cycle (A, B or C) tied to the last digit of the building’s block number. DOB publishes a FISP map showing each building’s cycle.

Only a Qualified Exterior Wall Inspector (QEWI) can do the inspection: a New York State licensed Professional Engineer or Registered Architect approved by DOB. The QEWI files the report in DOB NOW: Safety.

The report

Safe, SWARMP or Unsafe.

The three facade report classifications
ClassificationWhat it meansWhat happens next
SafeNo repair or maintenance needed to keep the facade sound, and it won’t become unsafe within five yearsNothing further until the next cycle
SWARMP (Safe with a Repair and Maintenance Program)Safe now, but needs repair or maintenance within five years to keep it from becoming unsafeRepairs must be done in the window the report sets; an uncorrected SWARMP condition must later be reported as Unsafe
UnsafeA hazardous condition that requires repairPublic protection goes up immediately and repair deadlines start (see below)

If it’s unsafe

Deadlines after an Unsafe report.

  1. Protect the public right away

    The QEWI specifies the type and location of protection. Acceptable options are a sidewalk shed, fence or structural netting, and all of them need a DOB permit.

  2. Repair within 90 days

    Owners must correct unsafe conditions within 90 days of filing the technical report.

  3. File an amended report

    Once every condition is corrected, an amended report is due within two weeks.

  4. Ask for more time if needed

    If repairs and the amended report can’t be finished within 104 days of the original filing, the owner has to request an extension.

Missing filing deadlines or letting repairs run late can lead to violations and penalties from the city. Sheds, scaffolding and repair work each need their own filings, which is where expediting helps.

Got an Unsafe facade report or a facade violation? Call us and we’ll map out the filings and deadlines.

Call (929) 367-0962

Cycle 10

Filing windows by block number.

FISP Cycle 10 sub-cycles by last digit of the block number
Sub-cycleBlock ends inFiling window
A4, 5, 6, 9Feb 21, 2025 to Feb 21, 2027
B0, 7, 8Feb 21, 2026 to Feb 21, 2028
C1, 2, 3Feb 21, 2027 to Feb 21, 2029

Owners of buildings taller than six stories must file an acceptable Cycle 10 report. Enter your block number in the facade cycle lookup to see yours.

Questions

Frequently asked.

Does my building need a facade inspection?

If it is taller than six stories, yes. Smaller buildings generally aren’t part of FISP, though they can still receive facade-related violations.

Who can inspect my facade?

Only a QEWI, meaning a NYS-licensed Professional Engineer or Registered Architect approved by DOB. An ordinary contractor can’t file the report.

Can I get a sidewalk shed removed?

Sheds come down once the unsafe conditions are corrected and the amended report is accepted. Delays usually come from unfinished repairs or missing filings.

Sources

Official sources.

General information about New York City procedures, last reviewed November 2026. Amounts and rules change and every property is different, so this isn’t legal advice. Call us about your specific situation.