A-110 The Bronx

DOB permit expediting in The Bronx.

Updated

Every NYC project runs through the Department of Buildings, and usually other agencies too. ASH Group NYC handles the filings, follow-up and agency coordination so your architect, contractor and schedule aren’t waiting on paperwork.

What we handle

Filings for every stage.

  • DOB applications for alterations and enlargements, filed in DOB NOW
  • Legalization and conversion applications
  • Plan examination: tracking reviews and coordinating responses to objections
  • Permits, inspections and sign-offs through job completion
  • Builder’s Pavement Plans, DOT permits and contractor registration
  • Related agency filings: DEP sewer connections and back flow prevention, FDNY fire alarm and fire protection plans, and Board of Standards and Appeals consulting

How it works

From application to sign-off.

  1. Scope review

    We look at your plans and property records to identify every filing, approval and agency the project will touch.

  2. Prepare and file

    We assemble the application with your architect or engineer and submit it in DOB NOW.

  3. Plan examination

    We track the review and coordinate responses to objections so the job keeps moving.

  4. Permit to sign-off

    Once approved, we manage permits, inspections and sign-offs, and line up what’s needed for a Letter of Completion or Certificate of Occupancy.

The Bronx deadlines

Inspection windows for The Bronx buildings.

The Bronx has 12 community districts. Gas piping inspections under Local Law 152 follow the district your building is in:

Local Law 152 gas piping inspection windows for The Bronx community districts
Sub-cycleThe Bronx districtsCycle 2Cycle 3
A1, 3, 10Jan 1 to Dec 31, 2024Jan 1 to Dec 31, 2028
B2, 5, 7Jan 1 to Dec 31, 2025Jan 1 to Dec 31, 2029
C4, 6, 8, 9Jan 1 to Dec 31, 2026Jan 1 to Dec 31, 2030
D11, 12Jan 1 to Dec 31, 2027Jan 1 to Dec 31, 2031

Facade inspections (FISP) for buildings taller than six stories follow the last digit of the block number instead, not the district. In a borough-block-lot (BBL) number, The Bronx is borough code 2. Use our facade cycle lookup or gas inspection lookup.

Questions

Frequently asked.

Do you handle dob permit expediting in The Bronx?

Yes. We work on properties in all five boroughs, including The Bronx. Send the address and we’ll review the records and follow up.

Does it matter which The Bronx community district I’m in?

For some inspections, yes. Gas piping inspection windows are set by community district, and The Bronx has 12 of them. The table above shows the window for each.

What does a permit expediter do?

An expediter manages the filing process: preparing and submitting applications, tracking reviews, coordinating responses to objections and following permits through inspections and sign-off, alongside your architect or engineer.

How long does a DOB permit take?

It depends on the scope of work, the type of review and how quickly objections are resolved. After a scope review we’ll give you a realistic timeline for your project.

General information about New York City procedures, reviewed November 15, 2026. Rules and penalties change and every property is different, so this isn’t legal advice. Call us about your specific situation.

Rather have us handle it?

Call, or send the address and a few details. We’ll review it and follow up.